Cullys have an extensive track record of delivering quality projects on budget and within timeframe. Our proven engineering contractor and maintenance services provider ability includes experienced in-house personnel and access to external specialist that give us the flexibility and versatility required to deliver innovative and cost effective solutions. We have substantial proven track record in engineering design, Mechanical Equipment & Pipework Supply and Installation, Switchboard & Control Panel Manufacture and Installation, Specialist Defence & Marine Contractor, Supply of Water & Wastewater Treatment Systems, Communications Technology Deployment, System Integration Testing & Commissioning and System Operation & Maintenance. The following project summaries demonstrate our proven capability, referees will be provided on requested.
- $2.5M integrated MBR sewage treatment system for Tenix Defence.
- In conjunction with EcoNova the 1.6ML/d NovaPro WRF for Clarence City Council, the provision of the NovaUltra 600kL/d WRF for the Point Boston Peninsula Community development and NovaTainer WRS for BHP Port Hedland facilities.
- Electrical installation for Warburton Mission Hospital. The modular system was built in Middle Swan and then transported by truck to Warburton Mission and reassembled on site. The complex consisted of an outpatient wing, X‐Ray facility, surgery, 12 bed dormitory, Doctors residence and a nurses quarters.
- Electrical installation for Warburton Mission, Sewerage treatment facility. Sewer main, automatic transfer pump station, settling ponds.
- Electrical installation & maintenance for Readymix Concrete Batching plants.
- Fremantle Port – Channel Markers; complete refurbishment of the of the deep water marker buoys, inclusive off the remote GPS positioning, solar lighting and buoy refurbishment.
- Electrical Maintenance of wire knitting and steel working machinery at Boral Steel Osbourne Park.
- Electrical installation for additions to the ABC News & film complex in Adelaide street Perth.
- For TCI, the PBA wireless broadband network infrastructure deployment.
- Electrical installation for Stage 2 Mitchel Freeway bridge construction between the Narrows bridge & Mount St Perth.
- 35 metre Ferries; design, specification, installation and commissioning of the electrical systems on the vessel such as the sewage system, OWS system, engine management systems & vessel control system.
- Electrical installation for Eastern Hills &Wanneroo Senior High Schools.
- Griffon Venture Remediation Project; total upgrade of the Accommodation inclusive of the monitoring of the unmanned machinery space, bridge monitoring systems, lighting & power systems.
- Xstrata Liddell Mine H&LV Washdown.
- Camp Knox Desalination Plant.
- Patrick Port Botany 100kL/d SWHS.

